An electrical fault on Brückner Extrusion line 7 requires replacement of a Sub D plug. The existing plug shows signs of a bad connection, as visible in the photo.
- The work involves electrical troubleshooting and soldering.
- The machine is available from 11 October 26 to 29 October 26.
- Plan for an estimated duration of 40 hours.
- A soldering iron is required.
Parts needed:
- Sub D plug
Visual evidence
Plug have bad connection
Requirements & skills
Technical
Electrical
Electrical Troubleshooting
Soldering
Brands
Brückner
Industry
Plastics Extrusion
Machine types
Extruder
Site requirements
Hard hatESD protectionLOTO certificationHi Vis vest