EUR 1 500.00/jour · forfait · fonds sous séquestre
Jours
1
Disponibilités
14 déc. au 18 déc.
Compétences requises
ElectricalElectrical TroubleshootingSolderingPreventive MaintenanceElectrical Maintenance+2 autres
AvantagesDéjeuner offert
Périmètre des travaux
Planned electrical maintenance is required on a Brückner Extrusion line 7 to replace a damaged communication connector causing poor connectivity.
- Replace and reterminate the faulty Sub-D plug on the controller PCB board
- Resolve intermittent connection issues currently secured with cable ties and tape
- Inspect adjacent wiring and confirm solid communication signals after installation
- Plan for an estimated 8 hours of work between 14 December 26 and 18 December 26
Éléments visuels
Plug have bad connection
Exigences et compétences
Technique
Electrical
Electrical Troubleshooting
Soldering
Preventive Maintenance
Electrical Maintenance
Cable Termination & Splicing
Electrical Wiring
Marques
Brückner
Secteur
Plastics Extrusion
Types de machines
Extruder
Pièces
Sub D plug
Type de travail
Maintenance planifiée
Consignes du site
Hard hatESD protectionLOTO certificationHi Vis vest