Neal Wareing
Field service technician and founder, FindFST
Measure twice, cut once right...
Upgrade project in South Africa. Asked the lads to make a small hole for 6 cables.
Short coffee break later, gaping hole.
Factory is incredibly dusty. Cabinets need to be airtight.
The lads spent the next 2 days cutting and welding. (work goes slow in SA).
Next time I'll draw the cut mark on the cabinet.
What should have been a 30 minutes job turned into 2 days.


- Industrial Engineering
- Welding
- Electrical Cabling