Service a Haas Automation CNC Machining Center requiring mechanical troubleshooting and bearing replacement. An electrical fault has been identified as a wiring short at a Wago S7 module. Photo evidence confirms the terminal is visibly faulty with charring and requires replacement to restore machine function. Technicians should plan to use a multimeter for electrical diagnostics. The machine is available for service between June 13 and June 26, 2026. Plan for an estimated duration of 40 hours.
Visual evidence
Bearings need replacing on Bobst printing unit.
Wiring short at Wago, now faulty and needs replacing.
Requirements & skills
Technical
Mechanical TroubleshootingBearing Replacement
Industry
Steel Manufacturing
Machine types
CNC Machining Center
Site requirements
Fire-resistant clothing No photography Safety glasses Hard hat Safety shoes